Height Difference(different height of two sides respectively

If heights of two sides of construction surfaces are different at a site, the construction without Rib-Lath must be done from lower skeleton to upper ones successively. But using Rib-Lath makes it possible to do at the same time. By reducing the process and eliminating the construction joints to make one skeleton, there occur few defects in construction. Shortening the construction time results in cost reduction. This method gives you quality improvement and saving the cost together.
* RIB-LATH FORM has less buoyant force than that of existing forms, which is good point to be utilized in construction.
![]() |
![]() |
|
![]() |
![]() |
|